Contact Us

Ataturk Avenue, G-5/1, Islamabad.

Phone:(+92) 51 9244598

Fax:(+92) 51 *******

Email:info@wcap.gov.pk

Web:http://wcap.gov.pk/

Achievements

Projects completed under Phase-I

  • Evaluation of Past and Present Resettlement Plans in Pakistan in the Context of International Best Practices Leading to Formulation of Improved Resettlement Plan
  • Strategic/Sectoral Environmental and Social Assessment (SSESA) of Indus Basin
  • Nation-wide study of Groundwater Availability and Conjunctive Management.
  • Studies and Policies for Benefit Sharing on Hydropower projects among Stakeholders.
  • Handbook on Water Statistics of Pakistan.
  • Feasibility Study of Underground Dams.
  • Feasibility Study of Small Dams and Water Storages.
  • Institutional Assessment of IRSA
  • Capacity Needs Assessment of MoWP and Line Agencies of WCAP.
  • Consultancy Services for Design and Construction of Office for PMPIU.
  • PMPIU Office Construction Work.
  • Development of National Flood Protection Plan-IV and Related Studies to Enhance Capacity Building of Federal Flood Commission.
  • Development of GIS/MIS Centre and Decision Support System to Enhance the Capacity Building of Indus River System Authority (IRSA).
  • Improvement of Water Resources Management of Indus Basin to Enhance the Capacity Building of Indus River System Authority (IRSA).
  • IBMR & Database and Strengthening of Flow Forecasting System.
  • Agro-Economic Farm Survey.
  • Sediment Management Study of Tarbela Reservoir.
  • Procurement of Antelope Software.
  • Upgrading of Antelope Software and Procurement of Security Surveillance, Fire Fighting and Security System of Antelope Software.
  • Procurement of CMTL Equipment, Spares of Rock Mechanics Lab under (Phase-I).
  • Procurement of Equipment for Establishment of Roller Compacted Concrete RCC Laboratory in CMTL and Training of CMTL Personnel (Phase-II).
  • Dam Safety Training.
  • Detailed Engineering Design, Tender Documents and PC-I of Tarbela 4th-Extension Hydropower Project Units 15 , 16 & 17 (1410 MW).
  • Detailed Engineering Design, Tender Documents and PC-I of Dasu Run-of-River Hydropower Project (4,320 MW).